SolarQuarter reports that preparatory work on the three-hectare Hambach site began at the end of 2025 and the first of 128 lithium-ion battery containers has been delivered. RWE says the system will help balance wind and solar fluctuations in fractions of a second. The location is significant because Hambach already hosts about 50 MWac of solar and a smaller 4.1 MW / 8.1 MWh battery, showing how former lignite sites are being repurposed for grid flexibility.
Source: SolarQuarter. Solar News summarizes; the complete story is on the publisher's site.

The US Senate voted 73-25 to advance the Bipartisan American Affordability and Jobs Act, a permitting reform bill backed by 300 solar and storage comp...

Energy stored in grid batteries across Australia's National Electricity Market reached a record 20.17 GWh, up 203% on the previous high set a year ear...

Panamint Capital has secured a $1.8 billion green loan for Big Rooter Power, a 1.2 GWdc solar project on reclaimed coal mine land at its Twin Oaks pow...